TANKING WITH DRAINAGE

PRODUCT:

3-4MM / TORCH-ON

METHODOLOGY:

  • Clean surface (Dust free) Saturate surface with bituprimer
  • Heat Welding 3-4mm
  • Torch-On to vertical surface / foundation
  • Overlaps to be 100-300mm dependant upon spec
  • Install 110mm Geo drainage pide for correct flow
  • Install Polyproperlene material over pipe area
  • Install drainage pide for correct flow
  • Install 14-19mm drainage stone against wall / foundatio
  • Install 19mm ply / hard board against waterproofed area